The HVAC units are in place, and almost ready to turn on.
Below, you will see eleven condensers/compressors in a newly built mechanical yard away from the church. Its purpose is to push freon into the system. It is manufactured by Mitsubishi; so it should run like your car - quieter and more energy efficient!
There are six air handlers up there to cover the front section of the church. The air handler sucks the air from the common return air (This is why they worked so hard on the crawl space!) and blows the processed air through the ducts and vents.
2) Above the usher closet right outside the Baptistery/cry room. There are three air handlers up there to cover the back-left section of the church.
3) In the stairwell going up the choir loft. There are two air handlers there to cover the back-right section of the church. In addition to these, two small units will be installed - one for the basement sacristy and another for the choir loft.