People were excited to see the current work progress inside the church.
Stephen Frei doing "Show and Tell."
Buzzy Ribbeck answering questions.
A few brave souls even climbed the scaffolding to get a closer look.
Work continues on the roofs. They're now repairing the back side of the church.
Re-plastering work continues. The apse wall is one of the last sections needed to be done.
Bryon Roesselet of Conrad Schmitt Studios doing some touch up work on the stenciling. This portion is not completely finished; there's one more layer of stenciling to apply.
Do you like the new fleur-de-lis design? The old one was flat; this one looks almost like 3D.
Meanwhile, the Ave Maria Hall (where we're having Mass) is beautifully decorated for Lent! Thank you, ladies!
Stay tuned for more updates!
Sent by Fr. Rommel Tolentino on Wednesday, March 6, 2019 at 8:53PM